Urban Cycle Parks Hiroshima
Project Outline
| Business owner | Chariloto Co., Ltd. |
|---|---|
| Location | Ujina Kaigan, Minami-ku, Hiroshima City, Hiroshima Prefecture, Japan |
| Building use | Keirin tracks, hotels and accommodation facilities, outdoor areas, etc. |
| Total floor area | Grandstand building: approx. 5,000 m² / Hotel building: approx. 8,500 m² |
Related Building Type
-
PPP/PFI
PPP (Public Private Partnership) is a concept that broadly encompasses methods for private sector participation in the provision of public services. By utilizing private capital and private know-how, we aim to improve the efficiency of service provision and the level of service. The main methods include comprehensive contracting out to the private sector and the DBO (public construction and private operation) method. PFI (Private Finance Initiative) is one of the PPP methods, and is a public works method based on the PFI Act that utilizes private funds, management ability, and technical ability for the construction, maintenance, management, and operation of public facilities. refers to The main method is the concession system. The country is actively introducing PPP/PFI, and efforts from both the public and private sectors are required.
-
Event
In recent years, there has been an increase in the number of cases in which PM/CM is being introduced in venue preparation for limited-time events such as sports and art. Venue preparation methods include the construction of new temporary buildings and structures, as well as the use of permanent facilities through renovation and expansion. In addition, after the event, there are several possible responses such as removal, restoration work, and leaving it as a legacy. When promoting a project, there are many cases where the organizers, operators, and venue owners are different, and there are a wide variety of parties involved that need coordination in venue development.
-
CRE/PRE
The ultimate goal of CRE (Corporate Real Estate) is to "increase corporate value" = "maximize ROA (Return On Assets)." Therefore, a wide range of fields, multiple perspectives, and specialized knowledge are required, not just financial strategy and real estate utilization perspectives. In addition, in addition to the perspective and knowledge of CRE, PRE (Public Real Estate), which aims to revitalize and improve public facilities such as schools and gymnasiums that are aging, will maintain and improve administrative services, and from the citizen's perspective. It is essential to formulate a strategy based on the actual situation in the region, such as how to use the facilities.
-
Facility Dr.
Facilities have a lifespan of several decades, and not only do they become obsolete, but their social deterioration progresses as well. In order to maintain and improve the value of a facility, it is necessary to select and implement the optimal solution from a variety of options, including renovation, expansion, reduction, and rebuilding. It is also important to prepare for facility running costs, future renovation costs, and expansion, downsizing, and conversion.
The Yamashita PMC